SEA Solar Studio
Add your equipment, plan for growth, and see your estimate.
01 / Equipment library
English · मराठी · Hinglish. Example ratings are estimates.
Add equipment from the library or use a template.
02 / Design assumptions
Extra capacity for tomorrow’s equipment. Applied once to PV, inverter and battery sizing.
4.5 peak sun hours and a 0.75 net performance ratio are editable planning assumptions, not a Maharashtra weather forecast. The ratio includes PV/inverter conversion and site losses. Storage loss is added separately for energy routed through the battery. Seasonal shading and monsoon production require a site study.
Depth of discharge and efficiency depend on battery chemistry and model. Battery energy covers the chosen backup period; multi-day off-grid autonomy and battery recharge energy need an engineer’s assessment.
Use the variable energy rate from your bill and the share of today’s electricity use that solar can supply. Excludes fixed charges, export credits, maintenance and financing. Future reserve earns no assumed savings.
Optional / Budget assumptions
Use quoted rates to calculate a budget and simple payback. Blank rates stay pending.
Use tax-exclusive rates; avoid counting installation twice if included in your PV rate. These are your scenario inputs, not an official SEA quotation.
Generated 28/11/2026 · Catalogue 2026.10.22-v1 · Engine 1.0.0
Incomplete load data; system sizing withheld.
| Equipment | Qty | Input W | Hours / duty | kWh/day |
|---|
Today: 0 kWh/day. Future allowance: 25% = 0 kWh/day. Planned: 0 kWh/day.
PV: — kWp (— × 550 W). Inverter: — kW / — kVA. Startup: — VA for 0 s. Battery: — nominal kWh at 48 V.
System: hybrid, phase 1. Assumptions: 4.5 peak sun hours, 0.75 net performance ratio, 4 backup hours, 0.8 depth of discharge, 0.9 battery-to-load efficiency.
Budget: Price pending. PV rate: pending ₹/kWp; battery: pending ₹/kWh; additional installation: pending ₹; GST: 0%.
Indicative savings: pending per 30-day month; pending per 365-day year. Tariff: pending ₹/kWh; load coverage: pending%. Fixed charges, export credits, maintenance and finance are excluded. Simple payback: — years.
Matched inverter: No verified match. This is not a quotation or a final electrical design.
Energy = quantity × electrical input watts × hours × duty cycle ÷ 1,000. Demand sums input W and W ÷ power factor for simultaneously running equipment. Motor HP is shaft output; input W = HP × 745.7 ÷ motor efficiency.
Planned values = today’s values × (1 + future buffer / 100). PV kWp = (planned daily kWh + storage losses) ÷ (peak sun hours × net performance ratio), rounded up to full panels. Hybrid storage throughput is capped at the selected backup loads’ daily energy and backup duration. Off-grid sizing conservatively routes all daily energy through storage. Battery nominal kWh = simultaneous backup kW × backup hours × future multiplier ÷ (usable depth of discharge × battery-to-load efficiency).
Startup demand conservatively includes all selected motor units starting together. Different-phase imbalance, MPPT voltage/current, string Voc, ambient derating, battery BMS limits and harmonic loads require an engineer. An on-grid inverter does not provide outage backup. Multi-day off-grid autonomy and exact battery recharge behaviour require further design.
Indicative savings use today’s load energy multiplied by your solar coverage percentage, capped at estimated usable solar generation, then multiplied by your tariff. Monthly savings use 30 days; annual savings use 365 days. Simple payback divides the entered system budget by annual gross bill savings and excludes maintenance, finance and replacement costs.
Appliance ratings are explicitly estimated or unknown. No manufacturer models or purchase prices are fabricated. University of Maryland: load assessment and solar sizing. Virginia Tech: appliance energy estimation.